Water Transmission
Southeastern Colorado
Project Size: 150-mile water transmission project, 11 booster stations
Value Added: CVL Consultants has completed several alternatives for a 150-mile water transmission project to deliver water from southeastern Colorado to the Front Range. The project included an RO treatment facility, a 24-inch diameter conveyance conduit and approximately 11 booster stations. The design also contemplates an in-line turbine to sustainably recover energy. CVL’s solution included topographic survey, preparation of easement and right-of-way obtainment support documents, jurisdictional approval consulting, coordination of gas and electric service to the system components, and facilities site design.