Helping Public Works Work
23rd Avenue & Roeser Road Detention Basin and Outfall Storm Drain
Phoenix, Arizona
This initial project consisted of a final design Drainage Report including HEC-1 Model; the design a 37 Acre-Feet Detention Basin including soccer field lighting; Low Flow Channel and Outlet Structure design; ½ Mile 78-Inch, ½ Mile 60-inch, and ½ Mile 42-inch Storm Drain design; and Hydraulic Gradient matching into Salt River W.S. The project also included that CVL coordinate with Landscape and Irrigation design by City of Phoenix and the SRP Irrigation design and SRP License.
- Final Design Drainage Report Including HEC-1 Model
- Design 37 Acre-Feet Detention Basin including soccer field lighting
- Low Flow Channel Design
- Outlet Structure Design
- Coordinate Landscape & Irrigation Design by City of Phoenix
- ½ Mile 78-Inch, ½ Mile 60-inch, and ½ Mile 42-inch Storm Drain Design
- Hydraulic Gradient Matching into Salt River W.S.
- Coordinate SRP Irrigation Design and SRP License
|
 |
|
 |
|
Congratulations to our newest LEED AP!
Timothy Starkey
Ranking Arizona Magazine
#1 - Enviro Firms:
- 85 Staff or More
#2 - Engineering: Civil
- 13 Engineer or More
#2 - Landscape:
Architects
#10 - Graphic Design Firms
|